Hurricane Sandy repairs on the A and C line will get underway in May.

The tunnel between Manhattan and Brooklyn suffered saltwater damage during the storm.

Work will be done on the weekends, with A and C trains using the F tunnel.

The MTA has done similar work on the R, G and 7 tunnels.