NY1.com

  64º

You are not signed in  |  Sign in here  |  Help

You're viewing a lite version of NY1.com

Time Warner Cable customers: Sign in with your TWC ID for video access.

Get my TWC ID. | Get TWC service. | Read the FAQ.

09/08/2007 01:06 PM

NY1 Exclusive: MTA Plans To Install Platform Doors On 7 Line Extension

By: NY1 News

  To view our videos, you need to
enable JavaScript. Learn how.
install Adobe Flash 9 or above. Install now.

Then come back here and refresh the page.

NY1 has learned exclusively the MTA plans to install subway platform doors on the new number 7 subway line extension.

The doors are designed to relieve the crunch of passengers boarding and exiting subways during rush hour.

The floor-to-ceiling mechanical sliding doors will be at the edge of the platform, similar to those seen on the JFK AirTrain.

According to MTA officials, the doors cost about $2 million per platform. The expense is expected to be made up in energy savings from new cooling systems.

This will be the first time platform doors have ever been tried on the subway.