Saturday, July 12, 2014

Follow us:
Follow @NY1 on Twitter Subscribe to this news feed 

News

Verrazano-Narrows Bridge Upgrade To Include New HOV Lane

  • Text size: + -
TWC News: Verrazano-Narrows Bridge Upgrade To Include New HOV Lane
Play now

Time Warner Cable video customers:
Sign in with your TWC ID to access our video clips.

  To view our videos, you need to
enable JavaScript. Learn how.
install Adobe Flash 9 or above. Install now.

Then come back here and refresh the page.

The Metropolitan Transportation Authority will spend nearly $236 million to replace the upper level roadway of the Verrazano-Narrows Bridge and create the authority's first reversible HOV lane.

This new lane will connect with HOV lanes that lead up to both ends of the bridge.

The project will also include a new drainage system, steel signs and LED lighting.

The bridge, which was originally built in the 1960s, will remain open to traffic on its upper level while the new roadway is installed.

Work will begin next year and is expected to be completed by 2017.

Got A Transit Tip?

Do you have a news tip or story idea about the city's transit systems? Send an email to NY1 Transit Reporter Jose Martinez.

10.11.12.248 ClientIP: 23.22.40.163, 23.62.6.63 UserAgent: CCBot/2.0 (http://commoncrawl.org/faq/) Profile: TWCSAMLSP